A different Take note: the favored serpentine route into the Salzberg will keep on being shut until the end of the construction operate. Development operate will start off on one September 2025 and can very last until eventually early summer months 2026. All through this time, the salt mine (salt https://stanleyb951fhj0.tkzblog.com/profile