Installation Overview At a prominent confectionery site in York, Newsome has commissioned a high-capacity 400 kW chiller, marking the timely execution of the project. Designed to reinforce ESG targets, the installation enhances cooling reliability while cutting overall power consumption and CO₂ discharge. https://active-bookmarks.com/story20616694/high-efficiency-400-kw-chiller-installation-achieves-50-000-yearly-energy-savings-and-200-metric-tonnes-co%E2%82%82-cut